NECA 200:2010 Recommended Practice For Installing And Maintaining Temporary Electric Power At Construction Sites Specifies installation procedures at construction sites for temporary power operating at voltages of 600 volts or less.

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$22.88 tax incl.

$52.00 tax incl.

(price reduced by 56 %)

1000 items in stock

Table of Contents

Foreword
1.Scope
2.TemporaryConstructionPower
3.Responsibilities
4.PlanningtheInstallation
5.LoadEstimate
6.PowerSourceSelection
7.DistributionSystemLayout
8.GroundingandBonding
9.EquipmentInstallationandProtection
10.Ground-FaultCircuitInterrupter(GFCI)Protectionfor
Personnel
11.WiringMethods
12.Receptacles
13.TemporaryLighting
14.SystemMaintenance
15.SystemRemoval
AnnexA:PlugandReceptacleConfigurations(NEMAStandard
WD6-2002)
AnnexB:OSHA29CFT1926.56:MinimumLightLevelsfor
ConstructionWork
AnnexC:ReferenceStandards

Abstract

Specifies installation procedures at construction sites for temporary power operating at voltages of 600 volts or less.