NASA KSC SPEC E 0017:1996

NASA KSC SPEC E 0017:1996 Electrical Power Cable, Installation Of, Specification For Establishes the requirements for installation and testing of 60-hertz alternating current (ac) power cables by support contractors at the John F. Kenedy Space Center (KSC). Open-wire and building-wire

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$26.40 tax incl.

$60.00 tax incl.

(price reduced by 56 %)

1000 items in stock

Table of Contents

1SCOPE
2APPLICABLEDOCUMENTS
2.1Governmental
2.1.1Specifications
2.1.2Drawings
2.2Non-Governmental
3REQUIREMENTS
3.1MaterialsandEquipment
3.1.1Materials
3.1.2Equipment
3.2Workmanship
3.3QualificationsofCableSplicers
3.3.1BasicRequirements
3.3.2MethodofQualifying
3.4Grounding
3.4.1RacewayGrounding
3.5CableandConductorIdentification
3.5.1CableIdentification
3.5.2ConductorIdentification
3.5.3Locations
3.6DissimilarMetals
3.6.1Prevention
3.6.2Protection
3.7UndergroundDuctCableInstallation
3.7.1PreparationofDucts
3.7.2CablePulling
3.7.3CableSupport
3.7.4BondingandGrounding
3.8AerialCableInstallation
3.8.1Preparation
3.8.2Installation
3.8.3CableProtection
3.8.4Hardware
3.9DirectBuriesCable
3.9.1Preparation
3.9.2Installation
3.9.3CableProtection
3.10ConduitRacewayInstallation
3.10.1General
3.10.2Preparation
3.10.3CableSupport
3.11CableTrayRaceway
3.11.1Preparation
3.11.2Rigging
3.11.3Installation
3.11.4CableProtection
3.12Metallic-Sheathed,Mineral-InsulatedCable
3.12.1Preparation
3.12.2Installation
3.12.3CableProtection
3.13CableSplices
3.13.1General
3.13.2Preparation
3.13.3Installation(5,000VoltsandBelow)
3.13.4Installation(5,000to7,000Volts)
3.13.5Installation(Above7,500Volts)
3.14CableTerminations
3.14.1Installation(600VoltsandBelow)
3.14.2Installation(5,000to15,000Volts)
4QUALITYASSURANCE
4.1General
4.2AcceptanceTest
4.2.1Rubber-InsulatedCables
4.2.2Thermoplastic-InsulatedCables
4.2.3Ethylene-Propylene-Rubber(EPR)Insulation
4.3InsulationResistanceTest
4.4TerminationSeries
4.5SpliceTests
4.6SleeveTests
5PREPARATIONFORDELIVERY
6NOTES
6.1IntendedUse
6.2Open-WingandBuildingWireConstruction
AppendixA-PRIMARYCABLE-DCVOLTAGETEST

Abstract

Establishes the requirements for installation and testing of 60-hertz alternating current (ac) power cables by support contractors at the John F. Kenedy Space Center (KSC). Open-wire and building-wire construction are not within the scope of this document.

Contact us