ISA RP77.60.05:2011 (R2012)

ISA RP77.60.05:2011 (R2012) Fossil Fuel Power Plant Human-Machine Interface: Task Analysis Provides guidance and suggest an approach for conducting a task analysis as part of the design and development of new control rooms/systems for power plants and for supporting major control room upgra

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$33.00 tax incl.

$75.00 tax incl.

(price reduced by 56 %)

1000 items in stock

Table of Contents

1Purpose
2Scope
3Definitions
4Roleoftaskanalysisinthedesign/retrofitprocess
4.1Natureoftaskanalysis
4.2Overviewofanalysisandneededresources
4.3Applicationoftaskanalysisduringthedesignprocess
5Specificationofdesignrequirementspriortotaskanalysis
5.1Identifyingsystem/subsystemrequirementsandgoals
5.2Functionanalysisandallocation
6Conductoftaskanalysisduringconceptualdesign
6.1Identifyingoperatortasksanddevelopingscenarios
6.2Analysisoftaskstoidentifydesignrequirements
7Applicationoftaskanalysisduringpreliminarydesign
7.1IdentifyingCRTandotherdisplayrequirements
7.2Evaluatingdesignoptionsusingtaskanalysisdata
8Applicationoftaskanalysisduringdetaileddesign
8.1Recommendationsfordisplaysandgraphics
8.2Control-displayintegration
9Taskanalysisappliedtosystemtestandevaluation
9.1Verifyingtheacceptabilityofdesigns
9.2Systemvalidation
AnnexA-References
AnnexB-CaseStudy

Abstract

Provides guidance and suggest an approach for conducting a task analysis as part of the design and development of new control rooms/systems for power plants and for supporting major control room upgrade programs.

Contact us