Table of Contents
1Scope
2References
3Definitions
3.1TermsdefinedinthisRecommendation
4Abbreviations
5Descriptionoftheproblem
5.1a.c.current(fordifferentmaindistributionsystems)
5.2Lightningcurrent
6Solutions
6.1Galvanicisolation
6.2Parallelbondingconductor(PBC)
7Responsibility
8Bondingbetweenbuildingsunderdifferentearthingandpower
feedingconditions
8.1Considerationincaseoflightningflashonthebuilding
9Bondingbetweenbuildingsunderthesameearthingandpower
feedingconditions
9.1ConsiderationincaseoffaulttogroundinaLVpower
feeding
9.2Considerationincaseoflightningflashonthebuilding
AppendixI-ConsiderationincaseoffaulttogroundinaMV
powerfeeding
Bibliography Abstract
Describes the situation in which equipment, connected together, is installed in different buildings with different earthing and power feeding conditions.