Table of Contents
CHAPTER1-PLANNING
CHAPTER2-GEOMETRICALCONFIGURATION
CHAPTER3-GEOTECHNICALINVESTIGATIONS
CHAPTER4-GEOTECHNICALREPORTS
CHAPTER5-CUTANDCOVERTUNNELS
CHAPTER6-ROCKTUNNELING
CHAPTER7-SOFTGROUNDTUNNELING
CHAPTER8-DIFFICULTGROUNDTUNNELING
CHAPTER9-SEQUENTIALEXCAVATIONMETHOD(SEM)
CHAPTER10-TUNNELLINING
CHAPTER11-IMMERSEDTUNNELS
CHAPTER12-JACKEDBOXTUNNELING
CHAPTER13-SEISMICCONSIDERATIONS
CHAPTER14-TUNNELCONSTRUCTIONENGINEERING
CHAPTER15-INSTRUMENTATION
CHAPTER16-TUNNELREHABILITATION
LISTOFAPPENDICES
APPENDIXA-EXECUTIVESUMMARY-THE2005INTERNATIONAL
SCANSTUDYOFUNDERGROUNDTRANSPORTATION
SYSTEMSINEUROPE:SAFETY,OPERATION,AND
EMERGENCYRESPONSES
APPENDIXB-GLOSSARYOFTERMSUSEDINROCKCORE
BORINGLOGS
APPENDIXC-CUT-AND-COVERBOXTUNNELDESIGNEXAMPLE
APPENDIXD-TUNNELBORINGMACHINES(TBM)
APPENDIXE-ANALYTICALCLOSEDFORMSOLUTIONS
APPENDIXF-SEQUENTIALEXCAVATIONMETHODEXAMPLE
APPENDIXG-PRECASTSEGMENTALLININGEXAMPLE
APPENDIXH-DEFICIENCYANDREFERENCELEGENDSFOR
IDENTIFICATION
APPENDIXI-FHWATECHNICALADVISORYONTHEUSEAND
INSPECTIONOFADHESIVEANCHORS Abstract
Gives recommendations for planning, design, construction, and structural rehabilitation and repair of the civil elements of road tunnels, including cut-and-cover tunnels, mined and bored tunnels, immersed tunnels, and jacked box tunnels.