ARINC 602A:1984

ARINC 602A:1984 Test Equipment Guidance (teg) Describes the software and hardware needed to test and troubleshoot avionic equipment, including line replaceable units (LRU's) and LRU subassemblies in the shop, plus the "ramp" equipment needed to i

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$129.36 tax incl.

$294.00 tax incl.

(price reduced by 56 %)

1000 items in stock

Table of Contents

1.0INTRODUCTION
2.0OBJECTIVESANDSCOPE
2.1Objectives
2.2Scope
3.0DOCUMENTATION
3.1General
3.2InstructionManualContents
3.2.1Calibration/No-CalibrationRequiredDecision
3.2.2PeriodicCalibrationVerification
3.2.3TablesandProcedures
3.2.4IllustratedPartsLists
3.3Specification/CalibrationTraceability
4.0TESTEQUIPMENTCLASSIFICATION
4.1General
4.2CategoriesofTestEquipment
4.3Location
4.3.1Shop
4.3.2FlightLine
4.3.2.1GeneralDesign
4.3.2.2PowerCords
4.3.2.3TestingEnvironment
4.3.2.4GovernmentRegulations
4.4Level
4.4.1SYSTEMS
4.4.2IRU
4.4.3Card/Assembly
4.4.3.1AnalogCardTesting
4.4.3.2DigitalCardTesting
4.5Application
4.5.1Dedicated
4.5.2Multi-System
4.5.3GeneralPurpose
4.6CategoriesofControl/Interface
4.6.1Manual
4.6.1.1Capabilities
4.6.1.2FunctionIdentification
4.6.2Semi-Automatic
4.6.3DedicatedAutomaticTesters
4.7Wrap-AroundTesters
5.0TESTRESOURCEREQUIREMENTS
5.1General
5.2AvionicsTestResourceRequirements
5.3UsesofTestResourceDocuments
5.4LRU/UUTInterfaceSignalRequirements(ISR)
5.5MinimumUseSpecification(MUS)
6.0TESTEQUIPMENTAPPLICATIONSOFTWARE
6.1General
6.2ProgramStructure
6.3Verification
6.4ProgramSoftware
6.5ProgramDocumentation
6.6SoftwareRights
6.7SoftwareMaintenance
7.0UUTTESTSOFTWARE
7.1General
7.2ResidentSoftwareandSoftwareinaMemory
Extension
7.3CommunicationwiththeTestEquipment
7.4Program
7.5Documentation
7.6SoftwareResponsibilities
7.7SoftwareMaintenance
8.0TESTERDESIGN
8.1ShopTestEquipment
8.2FlightLineTestEquipment
8.3EnvironmentalTesting
8.4Maintainability
8.5ComponentIdentification
8.6StandardComponents
8.7GroundsandShields
8.8IntegratedDesign
8.9TestPoints
8.10PrimaryElectricPower
9.0OPERATIONOFTESTEQUIPMENT
9.1Operation
9.2OperatorInterface
9.3RecordingofTestResults
9.4SafetyChecklist
10.0UUTPOWERREQUIREMENTS
10.1UUTPower
10.2ManualTesters
10.3ATE
11.0COOLINGOFEQUIPMENTUNDERTEST
11.1Cooling
11.2NoiseLevel
12.0MAINTENANCEUSEOFBITE
12.1Built-InTestEquipment
ATTACHMENTS
1Definitions/Abbreviations
2NoCalibrationRequiredDecisionGuide
3InterfaceSignalRequirements(ISR)
3AISRExample
4MinimumUseSpecification(MUS)
4AMUSExample





Abstract

Describes the software and hardware needed to test and troubleshoot avionic equipment, including line replaceable units (LRU's) and LRU subassemblies in the shop, plus the "ramp" equipment needed to identify the specific failed LRU on the flight line.

Contact us