ASQ Z1.9:2008

ASQ Z1.9:2008 Sampling Procedures And Tables For Inspection By Variables For Percent Nonconforming Specifies sampling plans and procedures for inspection by variables for use in procurement, supply and storage, and maintenance inspection operations. When applicable this standard shall be referenced

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$95.63 tax incl.

$217.35 tax incl.

(price reduced by 56 %)

1000 items in stock

Table of Contents

INTRODUCTION
SECTIONA-GENERALDESCRIPTIONOFSAMPLINGPLANS
SECTIONB-VARIABILITYUNKNOWN-STANDARDDEVIATIONMETHOD
PartI-SINGLESPECIFICATIONLIMIT
PartII-DOUBLESPECIFICATIONLIMIT
AppendixB-Definitions
SECTIONC-VARIABILITYUNKNOWN-RANGEMETHOD
PartI-SINGLESPECIFICATIONLIMIT
PartII-DOUBLESPECIFICATIONLIMIT
AppendixC-Definitions
SECTIOND-VARIABILITYKNOWN
PartI-SINGLESPECIFICATIONLIMIT
PartII-DOUBLESPECIFICATIONLIMIT
AppendixD-Definitions
SECTIONE-APPENDIX-MATCHWITHANSI/ASQZ1.4-2008

Abstract

Specifies sampling plans and procedures for inspection by variables for use in procurement, supply and storage, and maintenance inspection operations. When applicable this standard shall be referenced in the specification, contract, or inspection instructions, and the provisions set forth herein shall govern.

Contact us