Table of Contents
1Introduction
2Scopeandpurpose
2.1Scope
2.2Purpose
3Definitions
4Complianceschedule
5Necessaryinspectionexperience
6Constructionofacetylenecylinders
6.1Porousmass(filler)
6.2Solvent
6.3Core-holewithpacking
6.4Fusiblemetalpressurereliefdevice(fuseplug)
6.5Shell
7Acetylenecylinderinspection
7.1Prefillcylinderinspection
7.2Fillingandpostfillinginspection
8Acetylenecylinderrequalification
8.1Authorizedinspectors
8.2Cylinderinspectionequipment
8.3Inspectionforunauthorizedcylindershellrepairs
8.4Externalinspectionofacetylenecylindershells
8.5Inspectionofacetylenecylinderporousmass
8.6Inspectionmarkings
8.7Samplevisualinspectionandrequalificationreport
9References
10Additionalreferences
Tables
Figures
Appendices
AppendixA-Chartofchronologicalhistoryofacetylene
cylinderconstruction(Informative)
AppendixB-Acetylenecylinderperiodicvisualinspection
andrequalificationreport(Informative) Abstract
Describes the inspection and requalification of the acetylene cylinder shell and porous mass.